MOCs and MFRs

2021 Willamette Basin Coordination Forms

2021 Fern Ridge Coordination Forms

21FRN01 Fern Ridge outflow

2020 Willamette Basin Coordination Forms

20WVP01 Pool Restrictions IRRM
20WVP01 HCR-LOP_IRRM2020_TemperatureImpacts
20WVP02 MOC_CHS CoastFk_LittleFallCr2020
20WVP03 MOC_Mitigation Trout Release Schedule ODFW 2020
20WVP03 Attachment 1 200811 Trout HGMP Table 10.1-1 update signed
20WVP04 Hills Creek Dam Ramp Refill Restrictions IRRM
20WVP05 Mainstem Flow April 1-15
20WVP06 Mainstem Flow April 16-30
20WVP07 MFR Trout Stocking Fish Loss

2020 Fern Ridge Coordination Forms

20FRN01 Fern Ridge outflow

2018 Willamette River Coordination Forms

18WVP01 Trout and M&E
18WVP01 attachment 1 ODFW response to 18WVP01 Trout and RME
18WVP02 MFR Winter Steelhead Maximum Spawning Flows in the North and South Santiam Rivers
18WVP02 Attachment 1 NMFS comments 18WVP02 Winter Steelhead Maximum Flows
18WVP02 Attachment 2 StW max spawning flows N and S Santiams ODFW Comments 2018.05.21
18WVP03 Adult Fish Disposition
18WVP03 Attachment 2018 Disposition Table
18WVP04 MFR Willamette mainstem flow target at Salem
18WVP05 MFR Dorena Fern Ridge minimum flows
18WVP06 MFR Trout Stocking Wild Fish Section Incorrect Location
18WVP06 comments [Non-DoD Source] McKenzie and Alton Baker Canoe Canal releases
18WVP07 MFR Dorena Cottage Grove minimum flows
18WVP07 Attachment 1 MFR Dorena Cottage Grove minimum flows ODFW comments 2018.10.30

2017 Dorena Coordination Forms

17DOR01 Dorena Dam RO Failure, Delayed Refill, & Drawdown

2017 Willamette River Coordination Forms

17WVP01 Hatchery Baseline Monitoring and Evaluation
17WVP01 Attachment 1 NMFS Comment on MOC 17WVP01, hatchery and baseline monitoring, MCL, 07-13-2017

2016 Cottage Grove Coordination Forms

16COT01 MFR minimum flow

2016 Fern Ridge Coordination Forms

16FRN01 MFR flow decrease

2016 Willamette River Coordination Forms

16WVP07 MFR Spawning Flows in the North and South Santiam Rivers
16WVP06 MFR Flow Targets for mainstem Willamette and North Santiam Rivers
16WVP05 MFR Willamette mainstem flow targets at Salem
16WVP04 MFR Willamette mainstem flow targets
16WVP03 MFR Willamette mainstem flow target at Salem
16WVP02 MFR Willamette mainstem flow target at Salem
16WVP01 WFOP Review Period
16WVP01 attachment WFOP Review Period

2015 Willamette River Basin Wide Coordination Forms

15WVP02 Santiam Flows
15WVP01 Use of Power Pools